Time Relay Digital timer Relay  ASY-3D

Item : ASY-3D

 

Timer switch,time relay,timer relay,timing switch,weekly timer,electric timer,
din rail mounting timer,timer relay switch,automatically off switch. Time Relay Digital timer Relay

 

CLASSIFICATION DIGITAL TIMER
MODEL ASY-3D
DIMENSIONS 88H×58W×68D
MOUNTING& SOCKET SURFACE(-N)  
FLUSH(-Y) US-08 P3G-08
FULL TIMING RANGE SEC:9,99,99.9,999 MIN:99.9,999 HR:99.9,999
RATED VOLTAGE DC(V):12,24 AC(V):12,24,110,220,240,50/60Hz
INDICATOR OPERATING After contact transfer
O/P CONTACT MODEL ASY-3D
TIME LIMIT 1C  
TIME LIMIT 2C 5A
INSTANTENOUS 1C  
LIFE MECHANICAL 5×10times
ELECTRICAL 10times
ACCURACY REPEA TERROR ±0.05﹪max
SETTING ERROR 0
VOLTAGE ERROR ±0.05sec
TEMP ERROR ±0.05sec
RESET TIME 0.3sec max
CONSUMED POWER 3VA
AMBIENT TEMPERATURE ﹣10℃~﹢55℃
AMBIENT HUMINITY 48~85﹪RH
WEIGHT 230g
CONNECTION DIAGRAMS & TIMING CHART 34A

Q:How to guarantee my order and payment:

A:Ezitown has Alibaba trade Assurance,100% refundable if any quality or delivery problem.

Q:How to return the goods if meet any problem

A:we have DHL and Fedex account for return goods.buyer no need to pay any shipping cost for returning. Can contact our salesman to operate.

Q:Why Ezitown price is competitive, and quality seems rather good ?

A:because we have been manufacturing more than 20 years, we know what price and Quality buyer can sell well in market.the wholeseller have suitable profits

Q:Can we order many items and make combine shipment.

A:we can combine many items,and deliver by courier/sea/land/air etc. pack well.

Q:Can I order the cabinet/enclosure/box and the wiring material from you or other supplier,you make wiring and assembly for us ?

A:we have egineering, wiring and assembly team for low voltage/medium voltage/high voltage/DC control .can make drawing and diagram to confirmation and proceed the assembly.we have unite nation project in regular assembly.

Q:How can I make our own brand for my order

A:we supply OEM service if order quantity meet the OEM MOQ , contact to know the exactly quantity for your item

Q:What is the delivery if I make payment

A:Almost all items we keep in stock.and we have many order every day , We need 1-3 working days to packing and make delivery.OEM packing will be longer time.

Q:Can we visit your factory or office ?

A:we always welcome customer visit us, let me know the schedule, we will arrange.